Best Supply Warehouse Expansion

Eastlake, Ohio

Industrial Construction Experience

Cleveland Construction, Inc. performed as the Design-Builder for a fast-track warehouse addition at Best Supply's headquarters in Eastlake, Ohio.

The project included 17,500 square-feet of new building area added to the rear of the existing warehouse facility. The new addition was built using a pre-engineered metal building system with a CMU wainscot and metal wall and roof panels. Skylights were installed to maximize daylight to reduce power consumption.

Over 18,500 square-feet of the new pavement surface areas were added to the site. The storage yard was expanded by 4,000 square feet, which bridges the gap between the warehouse addition and the existing storage yard.

A new truck access drive was added that connects the warehouse addition to an existing parking lot.

A new asphalt parking lot was also added to allow 12 additional customer vehicles in front of the existing facility. Site utility improvements included the installation of a new sanitary sewer connection, relocating fire hydrant and stormwater drainage improvements.

Overview

  • Location
    Eastlake, Ohio
  • Owner
    Best Supply
  • Architect
    TDA Architecture
  • Completion Date
    December 2014

Industries

Services Provided

  • Preconstruction
  • Design-Build
  • Safety Management
  • Quality Assurance/ Quality Control
  • Scheduling

You have the vision... We make it true®

Our mission is to Make It True®. Whether that’s making the visions of architects come true...building true relationships with subcontractors...staying true to our word with owners and developers...or making our company a truly great career path for employees... our Make It True® mission is what creates the unmistakable trust, loyalty, and teamwork that sets Cleveland Construction people apart.

Get Started

Call to action Cleveland Construction