Retail Construction
New Big-Box Retail Center Construction Profile
Cleveland Construction, Inc. performed as the general contractor for a new 177,577 square-foot Walmart Supercenter #1814-03 big-box retail building in Elgin, Illinois for Walmart Stores, Inc.
The project was completed on time in September 2011. The construction duration was approximately 395 calendar days.
Cleveland Construction was responsible for earthwork, pavement, landscaping, Cast-In-Place foundations, slabs (interior and exterior), Concrete Tilt-Up Wall Panels, Masonry walls, structural steel, carpentry (rough and finished), cabinetry, EIFS/Stucco, Metal Wall Panels, Standing-Seam Metal Roofing, TPO Roofing, joint sealants, Hollow Metal Doors and Hardware, Aluminum Storefronts, and Glazing, Automatic Entrance Doors, Gypsum Board, Acoustical Ceilings, CFS Framing, Flooring, Paint Finishes, Toilet Compartments/Accessories, Fire Suppression, EMS, Sub-Metering, HVAC, Plumbing, Refrigeration, and Electrical.